In shortRepeat breakdowns hide in work-order history because descriptions are free text and every technician words things differently. Classify each work order by cause, count repeats per asset and per group of assets, rank them by how recently and how often they repeat and by the downtime they cause, then investigate the worst ones.

Why repeats are hard to see

A work-order system records each job on its own. The same fault can appear under different words, on different shifts, written by different people. Counting by asset alone misses faults that move across a fleet, and counting by description misses faults that are worded differently each time.

What your work-order export needs

FieldWhy it mattersExample
Asset or property IDLets you count repeats per asset and group assets by typeRTG115, P-101A, 14B Oak Road
Start and end date and timeGives the downtime or time to complete for each job12/10/2026 06:10 to 07:05
Problem description and work doneThe source for classifying the causeEngine overheating alarm, cleaned radiator
Work order typeLets you keep breakdowns and corrective jobs and leave out planned workBD, CM, PM
Man-hours and technician (optional)Useful context, not needed to find repeats3.5 h

Step 1: classify each work order by cause

  1. Agree a short list of causes that suits your industry, such as electrical, lubrication, leaks, controls or operator damage.
  2. Read the problem and work-done text, and place each job in one cause.
  3. Keep an 'unclear' category for vague descriptions, and review it later.
  4. Correct mistakes once and reuse the correction next time.

Step 2: count repeats at three levels

Step 3: rank by repeats and downtime

SignalWhat it tells you
Repeats close together in timeA fix that did not work, or a cause still active. This is usually the most urgent.
Repeats over a longer periodA slower pattern worth a planned investigation.
Total downtimeHow much the cause costs. Large downtime matters even with few repeats.
One very long eventA single failure that cost more than most. Worth a review even if it never repeats.

How close together counts as urgent depends on the industry. Equipment with no spare, such as port cranes, needs a short window. Plant with standby equipment may look over months.

An illustrative example

Illustrative
AssetCauseRepeatsDowntimePriority
Pump 12Seal leak4 in one week216 minHigh
Property 14BNo heating3 in two months38 hours to completeMedium
Fan 3Sensor fault2 in a year35 minLow

From repeat to root cause

A repeat tells you where to look, not why it happens. Take the work-order history for the worst repeat and use it as the starting point of a root cause analysis: what changed, what the earlier fixes were, and why they did not last. After the fix, keep watching the count. If the cause stops repeating, the fix worked.

Doing this with RapidRCA

The Repeat Finder in RapidRCA reads an Excel or CSV export, sorts each work order by cause, finds repeats for one asset, a group or the whole site, and ranks them High, Medium or Low using repeats and downtime. You can start an RCA from any repeat with its work-order history filled in, and your history builds over time.

Frequently asked questions

What is a repeat breakdown?

A repeat breakdown is the same type of failure happening again on the same asset, or across a group of similar assets, after it was supposedly fixed.

How many work orders do I need to find repeats?

A few weeks of breakdown records is enough to start. Longer history helps for slower patterns, and equipment with standby units may need months of data.

Should planned maintenance be included?

Usually not. Keep breakdown and corrective work orders for repeat analysis, and look at planned maintenance separately to see whether it is preventing the failures.

Run your own root cause analysis.
Describe the failure or add a photo or file, and RapidRCA builds the 5 Whys, fishbone, actions and report, using the ROOTS method.
Start an RCA

Last updated 14 October 2026. These guides explain a method and give examples. Always follow your equipment manufacturer's manual, your site procedures and applicable regulations.